一本道在线综合久合合

.
Home > > GF15 cement foam concrete unit

GF15 cement foam concrete unit



Operation principle of cement foam concrete unit: 

The cement, fly ash(fine particle powder), sand,etc. and water are mixed ready in the mixing tank according to the proportion by lightweight concrete special equipment, and press the mixture into pipeline by hydraulic conveying cylinder; foaming agent mixed with water according to the proportion, then mixed with compressed air by high pressure pump, form fine foams of high density in the pipeline, and then mixed with mixture in the pipeline,at last form lightweight concrete.

 cement foam concrete unit


Technical data of GF15 cement foam concrete unit:

Model

GF15

Maximum output

15m3/h

The maximum delivery height

100m

Farthest transport distance

500m

Total power

13.5kw

Mixing tank volume

0.4m3

Weight

800kg

Size

1850*1000*1400mm



Advantages of GF15 cement foam concrete unit:

1. Simple structure, light weight, easy operate.

2. According demands to choose suitable pumping speed.

3. Frequency cnverter controls the quantity of foams, adjusting foam concrete density. 

4. Dosing pump to dose foam agent and water based on fixed ratio automatically. 

5. Hose pump to deliver foam concrete, more stable, foam loss ratio very low. 

6. High cost-performance.

GF15 cement foam concrete unit


Applications Of cement foam concrete unit:

1. Can be used for providing insulating layer On The Floor. It can adjust the density according the mix design from 200-1600kg/m3.

2. Can used for Roof Insulation of refrigerated storage space. Besides, it can be used for filling tunnel and mine.

3. Can be used for producing foam concrete panels and CLC Blocks.

cement foam concrete unit for roof insulation


Delivery of cement foam concrete unit: 

cement foam concrete unit delivery



一本道在线综合久合合